Argona is a one-stop partner for greener commercial and industrial buildings in Belgium: solar panels, industrial battery storage, flat-roof renovation and electrical engineering, with one contact and one guarantee.
About Argona | Ecotechnics
Argona is an all-in-one partner for making commercial and industrial buildings sustainable across Belgium. The group brings together specialist companies, Eco Technics, Team Green, EG-elec, Deba, ADW, Adidak and Aditoit, covering solar panels, industrial battery storage, flat-roof renovation and new build, and electrical engineering up to medium and high voltage. With 190 specialists and over 40 years of experience, Argona has installed more than 520,000 solar panels and 10 million m² of industrial roofing. Clients get one contact and one guarantee, from feasibility study and grid study to installation, O&M and monitoring.
They also worked with Argona | Ecotechnics
Pidpa
Group Thys
Belgabroed (L'Œuf d'Or)
Alpro
What Argona | Ecotechnics has delivered
L'Œuf d'Or (Belgabroed)Agri-food
Storing on-site wind and solar power instead of exporting it
The Andenne hatchery, which delivers over 200,000 chicks a week, already produced green power with a wind turbine and solar panels. Argona | Eco Technics installed four 215 kWh Octave batteries driven by an integrated EMS, so surplus production covers the site's needs later instead of flowing back to the grid. Its supplier Scholt also trades the batteries on the day-ahead market.
The largest solar park in Kapellen, on the company roofs
Argona | Eco Technics covered more than 20,000 m² of Group Thys roofs in Kapellen with 7,614 solar panels, the largest solar installation in the municipality and slightly more than three football pitches of surface.
In August 2024, Argona | Eco Technics installed 379 Tier 1 solar panels at Pidpa's new station in Rumst, split between a rooftop and a ground-mounted array. The installation covers 22.5% of the site's 620 MWh annual electricity use.
At the Ghent pet food plant, Argona | ADW laid 1,700 m² of light-coloured TPO roofing over 100 mm of PIR insulation in two weeks; its reflectivity raises solar yield by 10 to 15%. Argona | Team Green then installed 318 high-efficiency panels whose output goes straight into production, plus three double EV chargers on the car park.
One day, real numbers. Meet the companies turning carbon strategy into measurable savings — and benchmark yours against Belgium's sustainability leaders. Seats are limited.
Real ROI case studies — companies saving up to €94k/year
Benchmark your climate strategy against 100+ industry peers
Leave with an actionable, board-ready reduction roadmap