Tractebel is a Brussels-based engineering and consulting company of the ENGIE group, with more than 1,600 staff in Belgium. For energy-intensive industries, utilities and infrastructure owners, it carries out the studies, design and construction management behind carbon capture, hydrogen, renewables and battery storage projects.

About Tractebel

Tractebel traces its roots in Belgium back to 1862 and is part of the ENGIE group. It has more than 6,000 experts and is present in 33 countries. In Belgium, more than 1,600 people work from its Brussels head office, its offices in Ghent, Hasselt, Ostend and Namur, and its marine and dredging engineering subsidiary IMDC in Antwerp, for private and public clients in the country and abroad.

Its services cover the whole life of a project, from strategy and roadmaps to pre-investment studies, implementation, operation and decommissioning, in markets such as renewables and energy storage, green gas and hydrogen, power and gas networks, nuclear, and environment and climate resilience. More than 200 environmental experts work on low-carbon and climate-resilient engineering. Tractebel's own near-term climate targets were approved by the Science Based Targets initiative in December 2025, including a 42% absolute cut in scope 1 and 2 emissions by 2030 from a 2024 baseline.

Aerial view of ENGIE's Flémalle combined-cycle gas power plant on the Meuse, where Tractebel acted as EPCM
The Flémalle gas power plant seen from the Meuse
Site visit at the Flémalle power plant on inauguration day
Start of works on the Green Turtle battery storage project in Dilsen-Stokkem
Wind turbines at the Port of Zeebrugge, where ENGIE is adding eight new ones

They also worked with Tractebel

  • Equinor
  • GIGA Storage

What Tractebel has delivered

ENGIEPower generation

Preparing the Flémalle gas power plant for carbon capture

Tractebel's task was to enable the integration of post-combustion carbon capture at ENGIE's combined-cycle gas turbine plant in Flémalle. With Laborelec, it ran a feasibility study on the technical and economic viability of capture at the site and its fit with the existing infrastructure, then designed the balance of plant and produced a full cost estimate. Tractebel also acted as EPCM for the plant itself, which has been available to the grid since 31 October 2025.

  • Integration strategy for the licensor's carbon capture design within the plant
  • Balance-of-plant design and full cost estimate as a basis for investment decisions
  • 875 MW plant that can run on renewable gases and be fitted with a CO₂ capture system
Read the case study
Equinor, ENGIELow-carbon hydrogen

Feasibility of a blue hydrogen plant with carbon capture in Belgium

Equinor and ENGIE are developing H2BE, a large-scale blue hydrogen production plant in Belgium with integrated carbon capture and CO₂ transport, to help cut industrial emissions. Tractebel carried out the pre-feasibility and feasibility work: design and technology reviews, geotechnical investigations, safety and demolition studies, and an assessment of transport by waterway. Its knowledge of local regulations, markets and site conditions helped derisk the project.

  • Technical and logistical questions covered from the start of the project
  • Feasibility basis for hydrogen production with integrated CO₂ capture and transport
Read the case study
GIGA StorageEnergy storage

Owner's engineer for Belgium's largest battery storage project

GIGA Storage Belgium is building Green Turtle, a battery storage facility on the Rotem industrial site in Dilsen-Stokkem that will store renewable electricity and feed it back to the high-voltage grid. As owner's engineer since the design phase began in 2024, Tractebel supports GIGA Storage on the battery systems, grid connection, electrical engineering, civil works, fire protection and overall project development. Construction started in August 2026 and commissioning is planned for March 2028.

Read the case study
ENGIERenewable energy in ports

Eight new wind turbines at the Port of Zeebrugge

ENGIE is adding eight wind turbines at the Port of Zeebrugge, on the Wallenius Wilhelmsen RoRo terminal and the International Car Operators premises, with a combined capacity of 42.6 MW. Tractebel supported the project throughout with feasibility studies, owner's engineer services for buying the turbine package, wind resource and energy yield assessments, and contractual advice, in the crowded industrial and logistics setting of the port.

Read the case study