Tapio
Back to marketplace
Tibo Energy

Tibo Energy

Energy & BuildingsScope 1Scope 2

Tibo Energy, from Eindhoven, makes software that steers the solar panels, batteries, EV and truck chargers and heat pumps of a business site within the limit of its grid connection. Its EMS recalculates the control schedule every five minutes, 48 hours ahead, and already runs on six Montea logistics sites in Belgium.

About Tibo Energy

Tibo Energy was founded in 2022 in Eindhoven, where it has its head office on the TU/e campus, and also has an office in Amsterdam. A team of around 30 people builds two products: energy simulation software to size a system on real data before investing, and an energy management system driven by its own algorithm, Alice, which weighs prices, weather forecasts and grid limits to steer every asset. Tibo sells mostly through installers and energy consultants, who handle the advice and the simulation while Tibo delivers the control, and puts its base of customers and partners in the Benelux at more than 100.

Its published case studies cover logistics, retail, food and agriculture, industry, offices and public buildings, from Lidl's electric truck depot in Almere to the Zeist fire station. In Belgium, Tibo's EMS runs on six logistics sites of the real estate company Montea, where it also operates batteries for the frequency control required by grid operator Fluvius. The website is available in Dutch, English and German.

Aerial view of a Montea logistics site in Tongeren, Belgium, with solar panels on the roof
Lidl distribution centre in Almere with electric trucks at the fast chargers and solar panels on the roof
Project team in front of the Enexis distribution centre in Best
Battery storage units at the Enexis site in Best, controlled by Tibo's EMS
Installer from Eigenenergie.net checking the energy system on a laptop on the solar roof in Best
Aerial view of the Zeist fire station, made nearly gas-free within its existing grid capacity

They also worked with Tibo Energy

  • Montea
  • Lidl
  • DHL
  • Intratuin
  • Thermo Fisher Scientific
  • Vanderlande
  • Eindhoven Airport

What Tibo Energy has delivered

MonteaLogistics real estate

One EMS for six Belgian logistics sites with solar and batteries

Montea, a listed logistics real estate company, runs six large sites in Belgium with extensive solar installations, several battery storage systems and energy-hungry distribution centres. With Tibo it first simulated dynamic energy scenarios for its portfolio, including EPEX day-ahead prices and grid stability requirements. The EMS now optimises the sites on EPEX prices and the imbalance market via Centrica, runs the QPOWER batteries in frequency-following mode as required by grid operator Fluvius, and reports the KPIs of all six sites. Montea is extending the EMS to 25 locations in the Netherlands and more sites in Belgium.

  • Six Belgian sites steered by one EMS
  • Batteries used for frequency control required by Fluvius
  • Roll-out extended to 25 sites in the Netherlands
Read the case study
EnexisGrid operator, distribution centre

Running a new distribution centre on 74 kW of contracted capacity

Dutch grid operator Enexis moved into a new distribution centre and workshop in Best whose 1,750 kVA connection came with only 74 kW of contracted capacity, and even Enexis had to queue for more. Installer Eigenenergie.net used Tibo's simulation software to test combinations of solar, batteries, heat pumps and EV chargers, then installed rooftop solar and two batteries. Tibo's EMS uses weather, consumption and price forecasts to level peaks, so the site never exceeds its contracted capacity and is not allowed to feed power back into the grid.

Read the case study
Lidl NederlandRetail logistics

Fast charging for 17 electric trucks in a congested grid area

Lidl Nederland wants to electrify all store deliveries well before 2030 and started in North Holland. At its Almere distribution centre the grid is heavily congested and feed-in capacity is 0 kW, so a larger connection was not realistic. Lidl and Tibo took the grid limit as the starting point and modelled the whole system with Tibo's simulation software before building it. Tibo's EMS now coordinates the fast chargers, solar and battery, aligns charging with the logistics planning so trucks are ready when needed, and optimises across CO₂, cost and grid constraints.

Read the case study
Veiligheidsregio Utrecht, Zeist fire stationPublic buildings

A nearly gas-free fire station within its existing grid capacity

The Utrecht Safety Region wanted to take the Zeist fire station off gas without touching its 24/7 readiness. The connection could not be increased and solar power could not be fed back into the grid. Installer Unica used Tibo's simulation software to match consumption peaks to the grid capacity, then installed rooftop solar, a 100 kWh storage system, heat pumps for heating and hot water, heat recovery and LED lighting. Tibo's EMS coordinates all installations and prevents unnecessary load on the grid. The central heating stays as a backup for the coldest days.

Read the case study
Hoogvliet SupermarktenRetail

Opening a supermarket on 57 kW of grid capacity

Hoogvliet's supermarket on the Steenovenweg in Utrecht sits in a renovated former auction hall with a large solar installation. Grid congestion limited the site to 57 kW of contracted capacity, too little to start the store in a conventional setup because essential installations could not run at the same time. With installer Brenergie, Hoogvliet added a 215 kWh / 100 kW battery, 10 charging points and a heat pump, all steered by Tibo's EMS. The store opened and runs entirely within its 57 kW, without a grid upgrade.

Read the case study

What customers say

“Netcongestie zorgde er voor het eerst voor dat we te weinig vermogen hadden om een winkel op te starten. We zochten een slimme en zuinige oplossing en kwamen uit bij de EOS van Brenergie en het EMS van Tibo. Daarmee benutten we onze aansluiting optimaal en combineren we die slim met de energie van onze grote PV-installatie.”
Joost van Velzen,Hoogvliet Supermarkten
“We gebruiken meer van onze eigen zonne-energie en voorkomen boetes door overschrijding van het gecontracteerd vermogen. Het systeem zorgt dat we grip hebben op kosten én op capaciteit.”
Jan Nijhuis,Contract manager, facility management & real estate, Enexis
“Zodra snelladers, een publiek laadplein, zonne-energie en een batterij samenkomen, moet je alles in goede banen leiden. Net als bij een orkest moeten alle onderdelen op het juiste moment samenwerken. Het energiemanagementsysteem vervult daarin de rol van de dirigent.”
Koen Mennen,Advisor, KVR Energy

Could Tibo Energy cut your footprint?

Book a 30-minute demo. We map your emissions to the highest-ROI actions and the partners who deliver them.

Book a demo