Reno.energy is an energy renovation contractor from Liège. Its own teams design, install and maintain solar panels and solar carports, industrial batteries, EV chargers, heating, ventilation and insulation for companies and public bodies in Belgium, France and Luxembourg.
About Reno.energy
Reno.energy (RENO.ENERGY SA) was founded in Liège in 2009 and now employs more than 250 people. Its teams study, carry out and coordinate projects through to completion, monitoring and maintenance, across three trades: energy (solar panels and carports, batteries, EV charging), thermal comfort (heating, heat pumps, ventilation, cooling) and the building envelope (insulation, roofs and facades, windows). Its offices are in Liège (Angleur), Brussels (Haren) and Dour in Belgium, Grass in Luxembourg, and Paris (La Défense), Valenciennes, Montpellier and Bordeaux in France. It has installed solar panels in more than 100 schools.
The company has grown in France by acquiring Milliot Green in 2024 and, in May 2026, Engie My Power, Engie's residential solar business, now Reno.energy My Power. EODEN and Ardent have joined its capital. In 2026 Reno.energy, Virya Energy and Wallonie Entreprendre launched Virya Reno C&I Investments, a platform that finances solar installations for Belgian companies and public bodies, with Reno.energy as EPC contractor in charge of engineering, procurement, construction, operation and maintenance. Its first project is a solar canopy of 24,000 panels over 75,000 m² at the Knauf site in Visé, and the platform aims to finance 100 MWp of solar.
They also worked with Reno.energy
Delhaize
Carrefour
John Cockerill
Knauf
Groupe santé CHC
TEC
UCM
Port of Brussels
What Reno.energy has delivered
Groupe santé CHC, MontLégia hospital (Liège)Healthcare
2,675 solar panels on an operating hospital
Groupe santé CHC wanted to cover part of the large energy needs of its MontLégia hospital and depend less on the grid, as part of its Pulse strategic plan. Between late 2023 and early 2024, Reno.energy installed 2,675 solar panels on two wings of the hospital while it stayed in operation. It is the largest installation of the CHC group, which now runs more than 4,500 panels across its sites.
XLG wanted to use the available surfaces of its Milmort site to produce power locally and to meet new charging needs. Reno.energy built a 631.25 kWp plant of more than 1,400 solar panels and installed 24 EV chargers, so the site combines on-site production, self-consumption and electric mobility.
The bpost site in Saint-Vith uses a lot of energy for its logistics and for charging its electric delivery vans. Under a public contract, Reno.energy designed and built a 205 kWp plant of 452 panels, connected through a distribution cabinet and a decoupling system to the high-voltage cabin about 100 metres away. The plant supplies the building and the 80 charging points for the vans. The project was run in German, Dutch and French with the different stakeholders.
Spi, ELOY, short-supply-chain hub of Droixhe (Liège)Public logistics hub
Solar, storage and charging in one project for a logistics hub
The short-supply-chain logistics hub in Droixhe links local producers with public bodies in the province of Liège. With the Spi, the province's territorial development agency, and ELOY, Reno.energy installed 1,172 east-west solar panels on the roof and the facade, a 200 kWh industrial battery to raise self-consumption and 7 double chargers, all under central energy management. Part of the panels sit on the facade, with custom corner joints, to keep the building's lines clean while adding production.
The TEC site in Mons serves public transport every day, so the works could not interrupt the service. Reno.energy installed 275 solar panels on the flat roof with SMA inverters, commissioned in 2019. The 99 kWp plant produces about 94 MWh a year, used on site, and avoids 23 tonnes of CO₂ each year.
Beaufays primary school (Renowatt programme)Education
Whole-building renovation of a school, with solar in the facade
Under the Renowatt programme, Beaufays primary school was renovated as a whole: envelope insulation, solar shading, new heating, ventilation and cooling, and solar production, while classes went on. Reno.energy coordinated the trades and integrated 178 semi-transparent panels into the architecture, 97 on two facade bands and 81 on a solar canopy over the playground, which let daylight through. The renovation cuts the building's energy spending and CO₂ emissions by up to 35%.
UCM wanted to combine a large solar plant with one of the biggest charging infrastructures in the region at its Wierde site. Reno.energy built a watertight carport carrying 504 solar panels and installed 26 double 11 kW chargers, 52 charging points in all, managed so that vehicles charge first with the solar power produced on site. Staff and visitors' cars are also sheltered from sun and rain.
“Comme c’était dans le cadre d'une rénovation complète du magasin, on voulait une solution optimale : Reno.energy s’est occupé de tout, des carports solaires en bois aux bornes de recharge qui rencontrent un grand succès !”
Delhaize Flémalle,Supermarket, full store renovation with solar carports and EV chargers
One day, real numbers. Meet the companies turning carbon strategy into measurable savings — and benchmark yours against Belgium's sustainability leaders. Seats are limited.
Real ROI case studies — companies saving up to €94k/year
Benchmark your climate strategy against 100+ industry peers
Leave with an actionable, board-ready reduction roadmap