Pantarein Water, based in Mechelen, designs, builds and operates wastewater treatment and water reuse installations for industry, from anaerobic treatment that turns organic load into biogas to reverse osmosis that brings treated water back to drinking-water quality.
About Pantarein Water
Pantarein Water develops circular water solutions for industry from its head office in Mechelen. Its 'Water at your service' approach covers auditing and process optimisation, on-site pilot tests, design, build and start-up, operation and innovation, and it takes part in Flemish research projects. Beyond treatment, it works on the whole water balance of a site, from intake and use in the process to reuse and discharge. Its technologies include anaerobic and aerobic treatment, membrane bioreactors, water reuse and micropollutant removal. Its management system is VCA** certified for the design, construction, operation and maintenance of water treatment plants.
Its 25 published reference projects are mostly breweries, malting, dairy and food plants, such as Carlsberg, Boortmalt, Kellanova, Danone, Coca-Cola and the Westmalle and Haacht breweries, together with waste and water operators such as Renewi and IOK, in Belgium, France, the Netherlands, Denmark and Portugal. Pantarein Water is part of the Pantarein group, alongside the sustainability consultancy Pantarein Publishing, and has worked with the investment company Korys since June 2025.
What Pantarein Water has delivered
CarlsbergBrewing
Wastewater treatment and reuse at the Fredericia brewery
In 2020 Pantarein Water built a new treatment plant for the Carlsberg brewery in Fredericia, Denmark. Anaerobic treatment breaks down the organic matter and produces biogas, an MBR with Blue Foot membranes treats the water aerobically, and reverse osmosis with remineralisation brings it to drinking-water quality. The biogas is used locally in the brewery. The plant won an award for the most innovative water treatment of 2021.
Water reuse and stricter discharge limits at the world's largest maltery
Boortmalt's maltery in the port of Antwerp has relied on Pantarein Water since 2017. Pantarein built an MBR treatment plant in 2018 and has operated it since. In 2024 the permitted COD of the effluent was halved from 200 to 100 mg/l and Boortmalt wanted to reuse water. Instead of activated carbon or chemical precipitation, Pantarein added closed-circuit reverse osmosis (CCRO) and nanofiltration, which concentrate the pollution into a much smaller volume and deliver permeate ready for reuse. Boortmalt invested in the extension, Pantarein operates it, and it started in December 2024.
From wastewater to drinking-water quality, financed and operated by Pantarein
At Kellanova's Mechelen plant, the maker of Pringles, Pantarein Water designed and built a compact treatment plant with containerised process units. Pre-treatment separates oil and fat, which a specialist partner turns into biogas elsewhere; aerobic treatment with membrane filtration brings the water to surface-water quality; closed-circuit reverse osmosis then brings it to drinking-water quality. Pantarein also finances the installation and operates it for at least ten years.
Energy-efficient aeration at the Rotselaar dairy plant
Pantarein Water has helped operate the treatment plant at Danone's Rotselaar site for years. In 2023 it replaced the old surface aerators of the aerobic treatment with retrievable fine-bubble aeration driven by energy-efficient turbo compressors, and now controls the aeration closely on the oxygen demand, with no loss of effluent quality or reliability.
Up to 70% of wastewater reused at the Delirium brewery
Brouwerij Huyghe in Melle, known for Delirium Tremens, started a water master plan with Pantarein Water in 2012. An MBR first doubled the capacity of the existing treatment plant. In 2016 a reverse-osmosis unit began upgrading the treated water to drinking-water quality for cleaning in the brewery. In 2019 an anaerobic pre-treatment was added, which converts up to 80% of the organic load into biogas, followed by an MBR and a second reverse-osmosis unit. Pantarein monitors the plant remotely and through frequent site visits.
From wastewater to drinking water at the Westmalle brewery
Pantarein Water has supported the Westmalle Trappist brewery since 2009. After upgrading the existing plant, it designed and built a new one in 2011, with an odour-treated buffer tank, two parallel bioreactors, an air lift and membrane filtration, all covered and housed in a compact building to limit odour and noise. In 2016 reverse osmosis was added to upgrade the treated water to drinking-water quality. Pantarein follows up the plant and evaluates it every month.
One day, real numbers. Meet the companies turning carbon strategy into measurable savings — and benchmark yours against Belgium's sustainability leaders. Seats are limited.
Real ROI case studies — companies saving up to €94k/year
Benchmark your climate strategy against 100+ industry peers
Leave with an actionable, board-ready reduction roadmap