Tapio
Back to marketplace
OPEN A

OPEN A

Energy & BuildingsScope 1Scope 2

OPEN A is an architecture practice in Tilff, near Liège, that designs energy renovations and low-carbon buildings for local authorities, SMEs and private owners. It starts from the existing building, cuts its energy needs and uses timber, CLT and bio-based insulation where they fit.

About OPEN A

OPEN A was founded in 2012 by architect Xavier Van Rooyen, who holds a doctorate in the history and theory of contemporary architecture with an academic background that includes ULiège, UMons and TU Delft. The practice works on everyday places: housing, schools, crèches, offices and public buildings, mostly in the provinces of Liège and Luxembourg. For each commission it puts together a team of architects, engineers and specialists, and it has entered competitions with MVRDV for Liège Airport City and for Les Boucles Vives at the Stade Vander Putten in Brussels.

Its climate approach is summed up in its own words: transform the existing building, reduce needs, choose resources. In practice that means keeping structures where possible, combining envelope and systems work, and using timber, CLT, bio-based insulation and recycled materials, as in the inclusive housing designed for Droixhe in Liège. OPEN A states the scope of each performance figure it publishes and keeps estimates separate from measured results.

Natural slate facade with coloured window frames of the Neufchâteau crèche
Exposed CLT structure and curved timber stair inside the Neufchâteau crèche
Reading corner of the renovated Theux library
CLT panels being assembled for the Durbuy crèche at the former convent in Barvaux
Glazed walkway of the Oneux school extension seen from the playground

What OPEN A has delivered

Ville de TheuxPublic buildings

Energy renovation of the Theux municipal library

The Theux library, 650 m² of reading rooms and offices, had to use far less energy without losing comfort or closing for good. OPEN A combined interior insulation, new window frames, balanced ventilation, heat pumps replacing the gas boilers and solar panels into a single project. Provisional handover took place in December 2025. The primary energy figures below are calculated targets, not measured results; five years of energy monitoring are planned.

Read the case study
Ville de DurbuyPublic offices

A former convent turned into low-energy CPAS offices

In Barvaux-sur-Ourthe, the former convent of the Pères Oblats had to house the CPAS offices (1,050 m²) and a crèche, while the existing crèche on the ground floor stayed open. Keeping the stone facades and the old bell tower meant insulating from the inside. OPEN A designed the envelope and systems together: a heat pump, suitable ventilation and 250 m² of solar panels. Works were certified in April 2026; the energy figure is a design forecast, not a measured result.

  • Forecast energy reduction of around 90% (design estimate)
  • Heat pump, adapted ventilation and 250 m² of solar panels
  • Existing building kept and converted rather than demolished
Read the case study
Ville de NeufchâteauSports facilities

Moving a public pool off fuel oil with locally grown biomass

The fuel-oil boilers of the Complexe du Lac pool in Neufchâteau (about 850 m²) were reaching the end of their life. The approach OPEN A presents pairs a biomass boiler with miscanthus grown on municipal land, worked out with the town and Promisc, so the fuel is produced close to where it is used. The renovation also covers the pool basin, water treatment and technical installations. Works started in June 2026.

  • Fuel oil to be replaced by a biomass boiler
  • Fuel from miscanthus grown on municipal land
  • Energy, water treatment and pool basin renovated in one project
Read the case study
CPAS de NeufchâteauChildcare

A CLT-built crèche for 66 children

The CPAS of Neufchâteau needed a new crèche, "Au creux des branches", for 66 children. OPEN A designed a 1,000 m² building with an exposed cross-laminated timber (CLT) structure inside and a natural slate envelope that echoes the regional schist. Large windows open the rooms onto the garden. The crèche was delivered in December 2019.

  • Load-bearing structure in cross-laminated timber (CLT)
  • 1,000 m² for 66 children, delivered in December 2019
Read the case study

Could OPEN A cut your footprint?

Book a 30-minute demo. We map your emissions to the highest-ROI actions and the partners who deliver them.

Book a demo