Tapio
Back to marketplace
Delpower

Delpower

Energy & BuildingsScope 1Scope 2

Delpower is an independent energy engineering firm in Wallonia. It takes industrial sites and tertiary buildings through their energy transition, from the energy audit and metering plan to monitoring, detailed studies, performance contracts, financing and the verification of savings.

About Delpower

Hervé Delporte founded Delpower in Herve in 2011, first as a consulting and engineering firm for building services in tertiary and industrial buildings. The company soon focused on energy savings for businesses and, from 2017, invested in digital services: energy metering systems and the measurement and verification of energy performance. It now combines energy engineers and software developers, runs its own monitoring software, EASEE, and has been based in Thimister-Clermont since 2021.

Delpower works for more than 165 industrial and 116 tertiary clients in Wallonia and Brussels, and with partners in the Grand Duchy of Luxembourg and in France. By its own count for 2025, it has worked on 470 sites and modelled €365 million of projects, €125 million of which have been carried out. These projects represent 257,000 tonnes of CO₂ a year in quantified savings, of which 65,000 tonnes have been saved.

Production hall at Vandeputte, where Delpower set up the metering plan and energy monitoring
Xavier Frère, Real Estate and Energy Manager at Thales Alenia Space, on the boiler room and cogeneration project with Delpower
Jérôme Hardy of Groupe Comet in a Canal Z report on the group's work with Delpower
Bernd Vorhagen, General Manager Benelux at NMC, in a report on the plant's energy monitoring with Delpower
A building of the Province of Walloon Brabant covered by Delpower's energy performance contract

They also worked with Delpower

  • Thales Alenia Space
  • UCB
  • GSK
  • Delhaize
  • Nexans
  • Firmenich
  • Knauf Insulation
  • Service public de Wallonie

What Delpower has delivered

Groupe CometWaste and recycling

13% less energy for a recycling group

Groupe Comet treats and recycles waste and signed the Walloon sector agreements, which give industry lower energy bills in return for efficiency efforts and investments. Over several years, Delpower's engineers studied its industrial processes, identified close to 70 improvement measures and built them into a €2 million action plan, from equipment upgrades to process optimisation. Delpower then followed the actions over time. The group's energy use fell by 13%, and the collaboration continues with new reduction targets.

Read the case study
Province du Brabant wallonPublic buildings

An energy performance contract for 16 public buildings

The Province of Walloon Brabant manages more than 100 buildings and wanted to save energy without losing thermal comfort. At the end of 2019 it tendered a four-year energy performance contract for the technical installations of 16 buildings: offices, schools, boarding schools and a medical-educational institute. Delpower's pay depended on the savings actually achieved on the bill. It managed the installations remotely, added control systems, coached the teams and supported projects such as boiler room renovation, pipe insulation and better controls. Savings beat the forecast and grew each year: 13%, 8%, 19% and 24%.

Read the case study
Thales Alenia Space BelgiqueAerospace electronics

New boiler rooms, a heat network and cogeneration in Charleroi

Thales Alenia Space designs and builds power distribution equipment for satellites and launchers at its Charleroi site. Its boiler rooms ran on heating oil, were inefficient and emitted a lot of CO₂, the heat network was fragmented and there was no central energy monitoring. Delpower designed the new boiler rooms and a natural gas cogeneration unit, linked the boiler rooms into one heat loop, replaced the heating controls, ran the tender and followed the works in two phases through to acceptance. The site now has 2,700 kW of heating capacity and 250 kWe of cogeneration, with savings of about 20% compared with the initial situation.

Read the case study
NMCChemicals

150 sensors to find quick wins in a foam plant

NMC, a family company founded in 1950, makes synthetic foams for decoration, insulation and technical uses. It wanted to follow its electricity, heat, compressed air and water use in real time to cut energy use, resources and costs. After a study phase, Delpower installed 150 sensors and meters across the plant and a monitoring platform for the management team. The data led to quick wins on compressed air (less waste), electricity (lower peaks) and water (anomalies detected), and to a series of corrective and preventive actions.

  • 150 sensors covering the plant's main consumption points
  • Quick wins on compressed air, electricity and water
  • Decisions based on real-time data
Read the case study
CapaulPrecision engineering

Monitoring that catches wasted compressed air and a badly set boiler

Capaul makes complex parts for aerospace, medical and rail customers, with 85 employees and a fully air-conditioned workshop. The maintenance manager had no view of how much energy the compressors, air conditioning, machine tools and hot water production used. Delpower installed sensors and meters with wireless data transfer to a software platform, modelled a reference consumption profile and set high and low thresholds with alarms. Solenoid valves now cut compressed air at weekends and in quiet periods, and hot water heating was retuned. When a maintenance visit wrongly changed the boiler's temperature settings, the platform flagged the jump in heating oil use and the settings were corrected.

  • Compressed air switched off automatically at weekends and in quiet periods
  • Real-time view of every key installation
  • Boiler setting error detected by alarm and corrected
Read the case study
AigremontFood industry

A sector-agreement energy audit for a margarine plant

Aigremont makes margarine in Flémalle for the food industry and retailers, with large electricity, heating and cooling needs. As a signatory of the Walloon sector agreements, it needed an energy model with its own performance indicators and a cost-effective investment plan, and its existing model had gaps. Delpower, appointed as energy auditor, modelled the whole process as a consumption matrix that accounts for the product mix, reviewed current and planned investments, and set an improvement target within the plant's technical and economic limits. The plant now tracks its energy performance year by year with a dashboard and indicators.

Read the case study

What customers say

“Grâce à l’accompagnement de Delpower, nous avons réussi à réduire notre consommation d’énergie de 13% en quelques années. Nous sommes déterminés à poursuivre cette collaboration dans les prochaines années afin d’atteindre une optimisation totale de nos consommations énergétiques.”
Jérôme Hardy,Head of Communication, Groupe Comet
“Grâce à l’accompagnement de Delpower, nous avons pu observer des ‘quick wins’ notables sur des installations clés telles que l’air comprimé, l’électricité et l’eau.”
Yann Péters,Project Leader, NMC
“Delpower peut intégrer complètement les outils technologiques ainsi qu’identifier et concevoir les solutions d’optimisation. Un outil technologique et les données ne valent pas grand chose sans une analyse d’expert !”
Ludwig Henkes,Managing Director, Capaul
“Nous avons choisi de travailler avec Delpower car, au premier contact, cette société semblait fiable. Cette fiabilité s’est confirmée avec le temps.”
Jean-Pierre Vanbostal,Production & R&D Manager, De Poortere Frères
“Nous avons choisi Delpower, car il s’agit d’une société sérieuse et fiable. La société Delpower nous a, en plus de l’installation, apporté une analyse et des conseils. De plus il s’agit d’une société locale.”
Félix Spirlet,Director, Spirlet Automobiles

Could Delpower cut your footprint?

Book a 30-minute demo. We map your emissions to the highest-ROI actions and the partners who deliver them.

Book a demo